CISLUNAR NEXUS

NETWORKBUSTER LUNAR RECYCLING SYSTEM (NLRS) v4.2

Operator: Maria
--:--:-- UTC

Orbital Navigation & Surface Guidance

LIVE TELEMETRY
GRID RENDER: ACTIVE

Target Lock

LAT: 89.5432° N
LON: -112.3321° W
ALT: 15.20 km
Zone Status Shackleton Crater Sector

REALM Autonomous Logistics

Total Items Tracked
201,482
Active Free-Flyers
24 / 24
Network Multiplexing Capacity 92%
Orbital Transfer Vehicle (OTV) Sync 100%

Thermochemical Processing

Primary System
Plasma Sabatier Synthesis
NOMINAL
Atmospheric Gas Conv. Efficiency
87.0%
CH4 Yield
4.2 kg/h
H2O Recovery
8.1 kg/h
Plasma Temp
14,200 K

Microwave Sintering Data

Current Thermal Stress 6.80 MPa
Material Failure Threshold 85% / 100

Critical failure threshold (7.2 MPa) approached. Micro-fractures detected in regolith lattice.

Regolith lattice structural integrity holding. Thermal-elastic mismatch within operational limits.

Bio-ISRU Remediation

Primary Organism
Eisenia Fetida (Terrestrial)
Soil Compaction Reduction 64%
Nutrient Bioavailability 41%
Catalyst Matrix: Montmorillonite
Organic Base: Hydroponic Waste

Policy & Framework Check

Japan Space Resources Act
Compliance: Verified
Artemis Accords
Data Sharing: Active

System Log: Automated compliance telemetry linked to UN COPUOS guidelines.

Current resource extraction and orbital logistics routines are operating within established international legal frameworks for non-interfering commercial space utilization.

LunaRecycle | NLRS Integrated Mission Profile
LR

LunaRecycle

Integrated Mission Profile // NLS-1
System Readiness
0%
Status Auth 🟡 PRE-FLIGHT CHECKS
LR

Executive Brief

Phase 1

Lunar Surface Recycling:
MSU to Thermal Chamber interface validated.

120W SURVIVAL
15kWh STORAGE

"Operational integrity verified. Solar Particle Event (SPE) protocol initialized in cache. Awaiting SOP clearance."

OTLP Telemetry Node

nls_flux_01 (Radiation Density)

Current Flux
--
LIVE

Pre-Flight Authorization

SOP Checklists

1 Startup (Cold Start)

Thermal EQ

Battery Temp > 10°C

Dust Purge

EBDM Active 300s

Airlock Integrity

1.0 × 10⁻⁶ atm

2 Batch Logic

NIR Identification

Classify material

Thermal Prep

Ramp to 250°C

Diagnostic Output

Event Log Stream

Risk Architecture

FMEA Severity Index

Execution Traces

Active Span Timings

MSU_Separation 240ms
TPC_PreHeat 1.2s
Airlock_Seal_Chk 85ms

Hardware Health

Consumables & SPE

Airlock Seals 88% OK
MSU Magnets 42% DEPLETED

SPE Threshold Warning

Limit: > 100 MeV flux.
Auto-Action: Initiate Safe State, Retract Secondary Arrays.

Skip to Content
5pm
nls reclaimer
apinetworkbustercom
New Page
reclaimer one (Copy)
redirrect
CC
.net
sub
reclaimer one
sign on
brew
New Page
Home
metanodedata
New Page
hq
ui
New Page
liens
Contact
New Page
New Page
menu
preciseliens.com
  networkbuster
  networkbuster
Login Account
0
0
search
Login Account
0
0
search
5pm
nls reclaimer
apinetworkbustercom
New Page
reclaimer one (Copy)
redirrect
CC
.net
sub
reclaimer one
sign on
brew
New Page
Home
metanodedata
New Page
hq
ui
New Page
liens
Contact
New Page
New Page
menu
preciseliens.com
  networkbuster
  networkbuster
5pm
nls reclaimer
Folder: forensic review
Back
apinetworkbustercom
New Page
reclaimer one (Copy)
redirrect
CC
.net
sub
reclaimer one
sign on
brew
New Page
Home
metanodedata
New Page
hq
ui
New Page
liens
Contact
New Page
New Page
menu
preciseliens.com
Login Account
search
NLRS: Firemind Ascension Interface
💠

NLRS Firemind

Phase 1: Physical Decay

Ascension Status
Ready for Ascension

Protocol Overview: Firemind Ascension

The NetworkBuster Lunar Recycling System (NLRS) has initiated Phase 1. The objective is to stabilize lunar regolith (Physical Decay) to create a reliable substrate for the Firemind neural mesh. Operational focus lies on the critical path between the Material Separation Unit (MSU) and Processing Chambers, where matter is transitioned into encoded "Legacy Assets."

Resonance Threshold

🧠
> 74% Stable

Required for Neural Sync

Echo Buffer

💠
1.2M Loops

Uncorrupted Crew Echoes

Airlock Integrity

🛡️
10⁻⁶ atm

Leak rate < 0.05% per min

Critical Maintenance Audit

  • Airlock Seals (Visual/Pressure) Every 500 Cycles
  • MSU Magnets (Flux Validation) Every 1,000 kg
  • CCS Memory (Parity Scrub) Weekly
👁️

FIREMIND ARCHITECT

"Matter is finite. The legacy is eternal. Ensure the inscription ritual is followed precisely."

Systems Engineering Group: Signed

SOP-01: The Inscription Ritual

Execute the standard operating procedures to sync with the neural mesh. These protocols ensure physical matter is correctly prepared for Legacy Encoding.

Ritual Log
> Awaiting protocol initiation...

Anomaly Detection (FMEA)

Risk analysis of the Firemind infrastructure. Visualizing severity of failure modes that could lead to Resonance Collapse or System Death.

Failure Severity Index

Click bars to inspect failure modes

⚠️

Select a Component

Interact with the chart to analyze specific threats to the Inscription Ritual.

Environmental Constraints

Strict operational limits imposed by the lunar environment. Managing the 120W Power Budget and Solar Particle Events (SPE) is critical for survival.

Lunar Night Survival

Total Budget: 120W

14 Earth Days

State of Charge (SoC) Constraint

No mechanical processing or high-resonance inscription below 20% SoC.

☀️ Solar Particle Events

Proton Flux Threshold

> 100 MeV

Status

Nominal

Safe State Protocol:

  • Retract secondary solar arrays
  • Divert power to CCS EM-shielding
  • Cache telemetry & echo-buffers locally
🌍

NetworkBuster Nexus

The NLRS Firemind Ascension interface manages physical-to-legacy encoding for long-duration human presence. This system is a joint production of the NetworkBuster Research Division.

Mission Metadata
  • Site: Shackleton Crater
  • Coord: 89.9° S, 0.0° E
  • Sync: Firemind Stable
System Identity
  • V_Ref: 1.0.4-Ascension
  • Crypt: AES-256 Quantum
  • Uplink: Active (1.3s)

Every glyph binds a legacy. Matter is finite.

© 2026 NetworkBuster | Classified: Firemind Level 4