Executive Overview
The NetworkBuster Lunar Recycling System (NLRS) has completed Phase 1 Operational Readiness. The primary architecture focuses on the critical path between the Material Separation Unit (MSU) and the Thermal Processing Chambers.
Critical Path
⚙️Material handover integrity confirmed.
Deployment Status
🚀Pending final payload integration.
Top Risk Factor
⚠️Thermal runaway mitigation active.
Report Context
This dashboard synthesizes data from the NLRS-ORR-PH1 document. It includes a detailed breakdown of failure modes, operational protocols for startup and batch processing, and environmental constraints specific to lunar operations (vacuum, thermal extremes, and radiation).
Risk Intelligence (FMEA)
Interactive analysis of failure modes. Click chart bars for details.
Severity Distribution (1-10)
Select a Component
Click on a bar in the Severity Chart to inspect the specific failure mode, root cause, and approved mitigation strategy.
SOP-01 Protocol Simulator
Standard Operating Procedure Execution Environment.
Environmental Monitor
Lunar constraints, power budget, and maintenance tracking.
Lunar Night Power Budget
Total Available: 120W
No mechanical processing permitted below 20% SoC (State of Charge).